|
|
|
|
Saturday, July 11, 2015
|
Kevin Morgan
|
|
|
Malta
Leadville, CO
|
2271 (Add a Comment)
|
|
|
Tennessee Pass (UP)
|
Union Pacific
|
Many people do not realize that Tennessee Pass never actually enters Leadville proper. The mainline is actually several miles west of downtown and there is no siding called Leadville on the line. There is, however, a small yard at Malta, in which cars could get set out and switched. The Colorado and Southern actually owned a branch line connecting Leadville and the mine at Climax. Until the mine shut down in 1995, the C&S would handle switching at the mine and bring cars to and from Leadville. Rio Grande would interchange with the C&S at Leadville via a connecting track from Malta. The connecting tracks has since been removed. In this picture, the yard at Malta lies empty...one of the tracks covered by small rocks slides over the years.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Saturday, July 11, 2015
|
Kevin Morgan
|
|
|
Malta
Leadville, CO
|
2554 (Add a Comment)
|
|
|
Tennessee Pass (UP)
|
Union Pacific, Rio Grande
|
A pair of (very old) D&RGW hoppers were, at some point, setup as a loading platform at Malta. The hoppers were laying on the ground and were filled with dirt. To the left of the hoppers is a man-made ramp, constructed out of dirt and rocks. It appears as though trucks and tractors could drive up on the platform and dump their load into gondolas parked on the track. This operation continued for a short time after Tennessee Pass was officially closed. UP's Malta Local ran from Pueblo to Malta until March of 1999. The last local, picking up the final few cars, departed for Pueblo on March 9, 1999.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|