Photo By: Kevin Morgan
 

After arriving in Denver an hour late, the Amtrak crews worked fast and got the Zephyr out of town only 15 minutes late. Here, the train is knocking down a clear signal at the east end of Leyden on its journey west. The signal here at east Leyden is one of only three sets of signals between Utah Junction and East Portal that have not been replaced by UP yet. The other two being Utah Junction itself (on the signal bridge) and the intermediates at Kipling. The intermediate's days are numbered too as a new signal is already in place once the new two main track project is completed.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1438
views
0
comments
Wednesday, February 29, 2012 at 8:43:50 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
Amtrak
Model
P42DC
Unit Number
AMTK 154

Symbol
AMT5-28
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
200
Flash
Did Not Fire

Focal Length
67 mm
Shutter
1/800 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.