Photo By: Kevin Morgan
 

AMTK 154 is the newest Phase 7 unit that I have personally seen. Amtrak is slowly repainting their entire fleet of P42DCs. I do not know at what pace Amtrak is repainting the units, but if they are repainting them at an average of one a week, it'll take a little under four years for them all to be repainted. Regardless of the time, the Phase 5 scheme will be disappearing, so get your shots while you can! AMTK 22 is still in Phase 5b paint as the westbound Zephyr passes by on the main at Leyden.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

7
views
0
comments
Wednesday, July 02, 2025 at 9:39:33 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
Amtrak
Model
P42DC
Primary Unit Number
AMTK 154

Paint Scheme
Amtrak Phase 7
Symbol
AMT5-01
Train Type
California Zephyr (Amtrak)



Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
130
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/2500 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.