Photo By: Kevin Morgan
 

It is fairly common to find five units on BNSF's Denver-Provo manifests and today is no exception. Three units are on the point and a pair of units, both facing west, are bringing up the tail end. The train is not particularly long today at about 4,500 feet.
Email Questions or Comments to the Webmaster.
User Comments (1)

Posted By Jayson Ewald On Monday, December 19, 2022 At 2:11:45 AM (PT)

love this view, how did you accomplish all these views near Tunnel 1 and the Eisle/Clay siding, where did you position yourself

Add Comment ]

374
views
1
comments
Sunday, December 18, 2022 at 11:10:31 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Eisele (Clay) (5,780 ft)




Train Information
Railroad
BNSF
Model
C44-9W
Unit Number
BNSF 5605

Symbol
HDENPVO1-18A
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/320 seconds
Aperture
f/4.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.