Photo By: Kevin Morgan
 

As BNSF's Denver-Provo turns toward the east portal of Tunnel 1, note the line of asphalt near the top of the frame. This is part of the construction of the new Canyon Pines subdivision. The development covers 180 acres and, when finished, will have about 90 single-family homes running up and over the top of Tunnel 1.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

247
views
0
comments
Sunday, December 18, 2022 at 11:15:41 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tunnel 1 (MP 23.4, 366 ft)




Train Information
Railroad
BNSF
Model
C44-9W
Unit Number
BNSF 5605

Symbol
HDENPVO1-18A
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/120 seconds
Aperture
f/4.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.