Photo By: Kevin Morgan
 

After returning to the main from the Rocky Spur, the power needed to run around the six cars that will be returned to Denver. Because the train has two six axle units, they could not wye on the spur. So, the power exited the west end of Rocky, came east through the siding, and is exiting the east end to go back on the main to then head east to North Yard. The conductor is protecting the shove for the engineer, located in the other unit.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

71
views
0
comments
Sunday, August 4, 2024 at 5:06:29 PM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS016 (East Rocky)




Train Information
Railroad
Union Pacific
Model
SD40-2
Unit Number
UP 1817

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS R6m2
ISO
640
Flash
Did Not Fire

Focal Length
400 mm
Shutter
1/250 seconds
Aperture
f/5.6


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.