A C44ACM, rebuilt from a C44AC-CTE, leads an eastbound coal load on Bypass 2. The I-76 overpass is the bridge in the background. Ahead at Pecos, the two mid-train swing helpers will be cut out and the train will continue east in a 2x(0)x1 configuration.
Email Questions or Comments to the Webmaster.