The conductor and the engineer of the MNYGJ work together to add the fourth unit from their train (to the left) to an eastbound coal load (to the right). They are ensuring all the MU cables are properly connected between the two units. The engineer is going to turn off the (dim) headlight on the previous trailing unit, and will turn on the (dim) headlight on the new trailing unit.
Email Questions or Comments to the Webmaster.