A westbound BNSF coal load is taking on the 2% grade of Soldier Summit on Main 1. The train loaded in the Powder River Basin in Wyoming, and is now making its way west across the former-Rio Grande. It is ultimately headed for the Valmy Power Plant in Nevada. The two coal-fired generating units at the plant are scheduled to be decommissioned in 2025, so this coal train is likely near the end of its life.
Email Questions or Comments to the Webmaster.