Photo By: Kevin Morgan
 

Just south of Castle Rock, there is a bridge being built across I-25, the Frontage Roads on both sides of I-25, and Main 1. This is a continuation of the road Crystal Valley Parkway. As you can see in this picture, the bridge itself has been built. But there is still a lot of work to come as interchanges with I-25 are going to be built. The frontage road on the west side of I-25 is closed and has been completely torn up in places, but will eventually be reopened. The entire project is expected to be completed in 2027.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

6
views
0
comments
Sunday, October 19, 2025 at 11:08:29 AM
image date



Location Information
City or County and State
Castle Rock, CO

Subdivision
Colorado Springs (UP)/Pikes Peak (BNSF)

Milepost or Control Point
Castle Rock to Larkspur




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 6064

Paint Scheme
BNSF New Image
Symbol
CBTMMLT-017
Train Type
Unit Coal



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/640 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.