For the past two weeks or so, one of the Zephyr trainsets has been running with a pair of Phase 7 P42DCs. The train is headed west on the main, passing two UP maintenance vehicles. The second truck will be used to haul 250 ties from Eisele (Clay) up to Tunnel 14 today. Only 40 ties can be taken per trip, so about seven trips will be required!
Email Questions or Comments to the Webmaster.