A North Yard switch job pulled out of North Yard and ran west to the Pecos Crossover. It then crossed over from Main 3 to Bypass 2 and started a reverse move. The switch job is now backing down Bypass 2, headed for the Belt Industrial Lead. There are numerous industries on the Belt Line that the yard job will switch out.
Email Questions or Comments to the Webmaster.