Photo By: Kevin Morgan
 

East of Rennicks Yard, there are roughly a dozen or so companies that ship and/or receive via rail. BNSF has a switch job that works six days a week switching cars out for the industries. Currently, a pair of GP39-2s have the task. The units are remote control enabled, so a single crewman is capable of throw switching and uncoupling cars, while controlling the units from his remote pack.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

2
views
0
comments
Friday, June 12, 2026 at 9:55:34 AM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Yard Shots

Milepost or Control Point
Rennicks Yard




Train Information
Railroad
BNSF
Model
GP39-2
Primary Unit Number
BNSF 2854

Paint Scheme
ATSF (Patched)
Symbol
Train Type
Yard Job




Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
110
898
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/2000 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.