Railroad photograph
Photo by: Kevin Morgan
UP 5391, heading west across the Belt Industrial Lead, is passing by the Cherokee Power Station, one of the largest power plants in the Denver area. In 2011 and 2012, two coal-fired units were retired. In 2015, a new natural-gas combined-cycle plant entered into service. In 2017, the last coal unit was converted to natural gas. For decades, Rio Grande (and later Southern Pacific and then Union Pacific) delivered coal to the power plant. Those days are now nearly a decade in the past.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

3
views
0
comments
Sunday, October 25, 2026 at 12:11:24
image date



Location Information

City or County and State
Denver, CO

Subdivision
Belt Industrial Lead (UP)

Milepost or Control Point
Broadway to Stock Yards




Train Information
Railroad
Union Pacific
Model
ES44AC
Primary Unit Number
UP 5391

Paint Scheme
UP Flag/Lightning/Wings
Symbol
MGRNY-24
Train Type
Manifest

Additional Unit Number(s)
UP 4840, UP 8618
   


Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
100
900
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/2000 seconds
Aperture
f/2.8