ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Photo ID: 113245
Date Shot
Photo By
Sunday, October 19, 2025 Kevin Morgan
Location
Times Viewed
Castle Rock to Larkspur
Castle Rock, CO
55
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
BNSF 6064 just passed another green intermediate as it gets close to the south end of the "Castle Rock Corridor", where Main 1 parallels I-25 for a little over eight miles south of Castle Rock.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 113244
Date Shot
Photo By
Sunday, October 19, 2025 Kevin Morgan
Location
Times Viewed
Castle Rock to Larkspur
Castle Rock, CO
69
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
The Frontage Road on the west side of I-25 is currently closed due to construction of the Crystal Valley Parkway bridge, just visible in the distance. A southbound BNSF coal load rolls by the south end of the closure, which has been in place for over a year at this point.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 113243
Date Shot
Photo By
Sunday, October 19, 2025 Kevin Morgan
Location
Times Viewed
Castle Rock to Larkspur
Castle Rock, CO
55
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
Just south of Castle Rock, there is a bridge being built across I-25, the Frontage Roads on both sides of I-25, and Main 1. This is a continuation of the road Crystal Valley Parkway. As you can see in this picture, the bridge itself has been built. But there is still a lot of work to come as interchanges with I-25 are going to be built. The frontage road on the west side of I-25 is closed and has been completely torn up in places, but will eventually be reopened. The entire project is expected to be completed in 2027.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112760
Date Shot
Photo By
Monday, July 14, 2025 Kevin Morgan
Location
Times Viewed
Castle Rock to Larkspur
Douglas County, CO
345
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
This is a spot that I have thought about shooting at, but I never got around to it until today! Love the wall of trees that this southbound unit coal train is passing as it cuts into the 1.2% grade. Uncountable thousands of coal trains have passed this way since the Powder River Basin really started mining in the mid-to-late 1980s.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112759
Date Shot
Photo By
Monday, July 14, 2025 Kevin Morgan
Location
Times Viewed
Castle Rock to Larkspur
Douglas County, CO
322
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
A southbound coal load parallels I-25 just north of Larkspur. Main 1 sticks pretty close to I-25 from Castle Rock to the I-25 exit for Larkspur. There, the highway continues over the ridge to Greenland, while the tracks cut through Larkspur, keeping the grade to roughly 1.2%.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.