ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page    

Photo ID: 104524
Date Shot
Photo By
Sunday, February 9, 2014 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
1599
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
West Cliff is one of three locations on the Moffat (east of the tunnel) where UP has not yet replaced the signals. You can see the classic target signal standing along the main on the right side of this shot. Meanwhile, a colorful Denver-Provo manifest sits in the siding to allow the westbound Zephyr to pass.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103735
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
2854
(1 Comment Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
To celebrate the 40th Anniversary of Amtrak, four P42DC's were painted in heritage schemes. Each scheme was inspired by a scheme previously used by Amtrak. The first of the four units to visit Colorado on the Zephyr was AMTK 156, wearing a Phase I inspired scheme with a Bloody Nose at a Pointless Arrow. I missed its trip west, but caught it coming back east. Here it is at the west switch of Cliff, looking dang good in my opinion.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103459
Date Shot
Photo By
Sunday, April 25, 2010 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
1777
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
After meeting an eastbound coal load, this Somerset-bound empty is throttling up and leaving the siding at Cliff westbound. The creek in the foreground is South Boulder Creek.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103448
Date Shot
Photo By
Saturday, April 24, 2010 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
1840
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
Hello C44AC-CTE! I personally am very glad that UP started putting the wings on the nose of their units again. The nose is just too darn plain and boring otherwise...
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103447
Date Shot
Photo By
Saturday, April 24, 2010 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
2225
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
In the Rio Grande days, the switch at the west end of Cliff was a "Y" switch. In other words, you diverged slightly whether you were staying on the main or taking the siding. Union Pacific has done away with that, however. Now, the main curves to the left before reaching the switch. Here, a westbound coal empty runs over the switch, passing the MNYRO which is tied down on the siding.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103446
Date Shot
Photo By
Saturday, April 24, 2010 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
1892
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
The conductor on this MNYRO has left the cab (and left the door open) and is now tying down cars on the train. No relief crew is available to take this train west, so here at Cliff it will sit and wait!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page    

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.