For decades, the Cherokee Power Plant (see here) was powered by coal, provided by Rio Grande, and then Espee, and the UP. However, about five years ago, the power plant converted to natural gas. UP's DV72 yard job is on the Belt Lead in the foreground.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A GP38-2 and an GP15-1 pull 13 cars through the OS at the Stock Yards (CP DS901) on the Belt Lead. Once clear of the OS, the train will make a reverse move and shove down the track to the right and tie down.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A UP yard job, which switches out some industries along the Belt Industrial Lead, heads west toward a red signal at the Stock Yards. The crew is going to call up the dispatcher and request a signal at the Stock Yards, followed by a signal on to the Stock Yards lead (seen up to the right) where it will drop its cars and the crew will be picked up by a van.
Email Questions or Comments to the Webmaster
or add a comment to the picture.