Amtrak has built in some padding in the schedule for the eastbound Zephyr between Fraser and Denver. Departure from Fraser is set at 3:50pm and arrival in Denver is 6:38pm. When running on clear signals, the train can easily arrive Denver by 6pm. So if the train is running 40-45 minutes late, that time can (in theory) be made up. Here, running ahead of schedule, the Zephyr approaches the grade crossing at Blue Mountain two seconds past 5pm.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 105017
Date Shot
Photo By
Friday, February 13, 2015 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
1468
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A very short eastbound California Zephyr makes its away around and down Big Ten Curve on the approach to a clear signal at the west end of Rocky. The Zephyr is running with only six Superliners this winter, reportedly so Amtrak can refurbish and repair the fleet. Also of note is that the Zephyr is running without a baggage car. Apparently, the baggage space in the Superliners is currently sufficient.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.