ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Photo ID: 111408
Date Shot
Photo By
Thursday, December 5, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
110
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
This eastbound BNSF manifest went into emergency when it was coming around Big Ten. The conductor walked the train and, a short time later, the train slow-rolled down and stopped on the main between switches at Rocky. I did not have a scanner at the time, so I did not hear what was wrong. But, at the time of this shot, the train continue to sit on the main.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111409
Date Shot
Photo By
Thursday, December 5, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
103
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
This GP39-3 (rebuilt from a GP39-2) has likely been assigned as a switcher in either Grand Junction or Provo. It is also likely due for a 92-day FRA inspection, and is therefore being taken to Denver on this Provo-Denver manifest. The unit was shut down, and simply enjoying the ride this afternoon.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111410
Date Shot
Photo By
Thursday, December 5, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
84
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
With the short winter days and tower Rocky Mountains to the west, much of Eisele (Clay) is pushed into the shadows by 2:30pm. By 3:00pm, much of Big Ten and Little Curves are in the shadows. And, as you can see, at 3:30pm, the shadows are nearing the head end of this eastbound BNSF manifest, currently stopped on the main due to a mechanical issue.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111411
Date Shot
Photo By
Thursday, December 5, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
149
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
I think this might just be one of the most unique pictures I've ever taken! This eastbound BNSF manifest is stopped on the main at Rocky due to a mechanical issue. While it was stopped (and I was waiting around as well), this gentleman flying a paraglider showed up! With a propeller strapped to his back and a parachute ("wing") overhead, he propelled his way down the siding at Rocky, alongside the stopped manifest!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111412
Date Shot
Photo By
Thursday, December 5, 2024 Kevin Morgan
Location
Times Viewed
Rocky Flats Industrial Lead
Arvada, CO
96
(Add a Comment)
Subdivision
Railroad
Rocky Flats Industrial Lead (UP) Union Pacific
For the past several weeks (maybe even a couple months), these five covered hoppers have been hanging out near the southern end of the Rocky Flats Industrial Lead. I'm not sure why they are here...it seems that the west local has not been running to deliver or pick up cars from the aggregate plant at the north end of the spur.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.