ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 108091
Date Shot
Photo By
Saturday, May 30, 2020 Kevin Morgan
Location
Times Viewed
Converse Jct
Converse County, WY
893
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
A westbound coal empty charges north at track speed (50 MPH) on Main 2 as it passes through Converse Jct and by the Antelope mine. A string of stored hoppers sits silently on Main 4, two tracks to the right of the empty on Main 2.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108090
Date Shot
Photo By
Saturday, May 30, 2020 Kevin Morgan
Location
Times Viewed
Antelope Mine
Converse County, WY
953
(Add a Comment)
Subdivision
Railroad
Yard Shots BNSF
This is an aerial view of one of 11 coal loadouts found in the Powder River Basin of Wyoming. This particular loadout is the Antelope loadout, the southern most loadout in the Powder River Basin.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108089
Date Shot
Photo By
Saturday, May 30, 2020 Kevin Morgan
Location
Times Viewed
Antelope Mine
Converse County, WY
933
(Add a Comment)
Subdivision
Railroad
Yard Shots BNSF
One of three trains starts to make its away around the balloon track, ready to proceed underneath the tipple at the Antelope Mine and load up. Two other empties will have to wait a bit longer for their turn to load.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108088
Date Shot
Photo By
Saturday, May 30, 2020 Kevin Morgan
Location
Times Viewed
Antelope Mine
Converse County, WY
889
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
The five staging tracks at Antelope Mine are currently all filled up with trains. Three trains are empty and waiting to be loaded. One train has already loaded and is waiting for a crew to take it east. One line of cars - the second from the right - is a string of empty hoppers currently being stored as there is no demand for them right now. The empty set with the sole SD70ACe for power is currently move away from the camera at 2 MPH, getting ready to load.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108087
Date Shot
Photo By
Saturday, May 30, 2020 Kevin Morgan
Location
Times Viewed
Antelope Mine
Converse County, WY
870
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
BNSF 9063, the rear DPU on a coal empty, is slowly moving away from the camera at 2 MPH as this particular empty prepares to go under the tipple to load up with coal. It is one of three empties waiting for its turn to load.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108085
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
MP 88.7
Converse County, WY
918
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
A few miles south of Bill, this loaded BNSF nacelle train has clear signals on Main 1. The train will leave the Powder River Basin about 40 miles ahead, entering BNSF's Canyon Sub so it can continue to its destination.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108084
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
West Bill
Bill, WY
842
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
The sun is sinking in the western sky, revealing a brilliant sunset after evening storms. A southbound BNSF train passes through the OS of the West Bill Crossover on its way south on Main 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108083
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
MP 77
Converse County, WY
914
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
The Orin Subdivision is 127 miles long and has 11 coal loadouts over that stretch. It is extremely rare to find a non-coal train running in the Powder River Basin, but such was the case on this lucky evening as an eastbound (geographic southbound) BNSF train came through carrying Vestas windmill nacelles.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108081
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
MP 77
Converse County, WY
821
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF, Union Pacific
The Powder River Basin (Orin Subdivision) has a stretch of four main tracks over a roughly 20 mile stretch of track going over Logan Hill. With the recent downturn in the demand for coal, traffic in the Powder River Basin has dropped. In addition, there is less of a need for hoppers to haul coal. To kill two birds with one stone, UP and BNSF have stored over a dozen complete train sets of open hoppers on Main 4 in the Powder River Basin. You can see several of those train sets here. Mains 1 through 3 are clear and available for running trains.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108080
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
MP 97.9
Converse County, WY
863
(Add a Comment)
Subdivision
Railroad
Orin (BNSF) BNSF
One of the earliest ES44AC "GEVO" units on BNSF's roster brings up the tail end of an eastbound coal load on Main 2 as afternoon thunderstorms build to the west. The train has about 30 minutes left to go before exiting the south end of the Powder River Basin.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108079
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
Bridger Jct
Orin, WY
855
(Add a Comment)
Subdivision
Railroad
Canyon (BNSF) BNSF
After waiting for a handful of westbounds, this eastbound coal load now has a clear signal at Bridger Jct to head east on the BNSF Canyon Sub on Main 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108077
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
Bridger Jct
Orin, WY
847
(Add a Comment)
Subdivision
Railroad
Canyon (BNSF) BNSF
As is typical on the majority of BNSF coal train, this empty has a pair of DPUs on the tail end. The rain is leaving the Canyon Sub behind and is entering the Orin Sub and the southern end of the Powder River Basin.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108076
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
Bridger Jct
Orin, WY
902
(Add a Comment)
Subdivision
Railroad
Canyon (BNSF) BNSF
Just south of Bridger Jct on BNSF's Canyon Subdivision, a westbound (geographic northbound) coal empty crosses over the North Platte River on Main 2. The addition of a second main here is relatively new, accounting for the different in style of the bridge compared to Main 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108075
Date Shot
Photo By
Friday, May 29, 2020 Kevin Morgan
Location
Times Viewed
Bridger Jct
Orin, WY
895
(Add a Comment)
Subdivision
Railroad
Canyon (BNSF) BNSF
A westbound (geographically northbound) BNSF coal empty, led by a pair of SD70ACes, approaching a clear signal on Main 2 at Bridger Jct. The empty is headed for the Powder River Basin to load.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108074
Date Shot
Photo By
Thursday, May 28, 2020 Kevin Morgan
Location
Times Viewed
Barbara's Gulch (MP 15.9 to MP 17.2)
Arvada, CO
902
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
A loaded BNSF sand train grinds west through a green and lush Barbara's Gulch on a cooler, overcast day. The train has three units on the point and two bringing up the rear. Just ahead around the bend is an Approach (yellow over red) signal at the east switch of Rocky. The train will have to sit between switches on the main at Rocky for a few hours to wait for Maintenance of Way to clear up further west.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.