Active Project List
Pecos Street Overpass (UP) - Raise Pecos Street at the north end of North Yard to run over the tracks leading into and out of North Yard and the Belt Line, as well as BNSF's Front Range Sub.
Second Main Track - C&S Junction to Arvada (UP) - A second mainline will be added parallel to the existing mainline between C&S Junction and Arvada (CP DS007) on the Moffat Tunnel Sub.
|
|
Long-Term Project List
Completed Project List
Belt Line Flyover / Utah Junction Bypass (UP) - Two new bypass tracks will be constructed that will run from C&S Junction to the Belt Main Line at Broadway. The new tracks will cross over the BNSF Front Range Subdivision on a grade separation.
Tolland Extension (UP) - The siding of Tolland on the Moffat Tunnel Subdivision will be extended to the east.
Wadsworth Parkway Underpass (BNSF) - Wadsworth Parkway will be lowered to run underneath the BNSF Golden Branch in Arvada.
Winter Park Grade Separation (UP) - Note that this is a correction from the previous belief that Winter Park was being extended to the east. The tracks will pass underneath a new underpass for Timber House Road Crossing near the west end of Winter Park.
Yarmony Extension (UP) - The siding of Yarmony on the Moffat Tunnel Subdivision will be extended to the west.
|
|
Rumored Project List
|
|