|
|
|
|
Wednesday, May 25, 2016
|
Kevin Morgan
|
|
|
Moffat Tunnel (West Portal)
Winter Park, CO
|
1535 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
Even though the EMD prototypes are not particularly visible in this shot, I still consider this the "shot of day"! EMD's testing special is creeping along at 12 MPH as it enters into the west portal of the Moffat Tunnel. The Winter Park ski resort has shut down for the season. The green pipe to the left is a water pipe that goes through the Moffat Water Tunnel (which parallels the train tunnel). It carries water to the Denver area from the west slope of the divide and was a key reason the train tunnel was built.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Monday, March 19, 2012
|
Kevin Morgan
|
|
|
CP DS057 (East Winter Park)
Winter Park, CO
|
1616 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
You can see numerous skiers still hitting the slopes of Winter Park in the background as the tail end DPU on this MNYRO emerges from the Moffat Tunnel and passes the repeater signal at MP 56.5. This signal displays the same aspect as the east switch of Winter Park, which can be see in the distance toward the right side of the photo. The signal allows westbound trains to know what to expect at the east switch of Winter Park. If this repeater is red, trains may pass the signal, prepared to stop at east Winter Park.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|