|
|
|
|
Friday, March 28, 2025
|
Kevin Morgan
|
|
|
Lynn to Kyune
Carbon County, UT
|
22 (Add a Comment)
|
|
|
Provo (UP)
|
BNSF
|
A westbound BNSF coal load is taking on the 2% grade of Soldier Summit on Main 1. The train loaded in the Powder River Basin in Wyoming, and is now making its way west across the former-Rio Grande. It is ultimately headed for the Valmy Power Plant in Nevada. The two coal-fired generating units at the plant are scheduled to be decommissioned in 2025, so this coal train is likely near the end of its life.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Friday, March 28, 2025
|
Kevin Morgan
|
|
|
CP RG639 (East Kyune)
Utah County, UT
|
18 (Add a Comment)
|
|
|
Provo (UP)
|
Rocky Mountaineer
|
Kyune is one of three sidings located on Soldier Summit. Even though Soldier Summit has two main tracks, sidings are still occasionally necessary. If nothing else, two of them can serve as crossover between the two mains as they are "center sidings", located between the two main tracks. Kyune is the first of the sidings when heading west. The Mountaineer throttles up as the max speed increases from 30 MPH to 35 MPH. Note the very interesting signal protecting the siding. The red signals on the right side of the signal indicate the switch leaving the siding is aligned toward Main 2.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Saturday, September 30, 2006
|
Kevin Morgan
|
|
|
Kyune
Fairview, UT
|
2265 (Add a Comment)
|
|
|
Provo (UP)
|
Utah Railway
|
Utah Railway has, traditionally, leased power rather than purchased it. The lease is always an extended lease, lasting for 10 years or longer. It is always interesting to see what is on the roster each time you visit the Utah. On this day, four SD50S's, one ex-ATSF SD45, and an MK50-3 working hard up the 2% grade just west of Kyune.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|