|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
Tunnel 48
Routt County, CO
|
185 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
Deep in Rock Creek Canyon, the Phippsburg Local emerges from Tunnel 48 on the Craig Branch. The west portal of Tunnel 46 is also visible on the right side of the frame. Tunnel 47 is obscured behind a curve.
There are rumors that UP is trying to negotiate with UP to potentially bring daily passenger runs between Denver and Steamboat Springs. That would be great, allowing people to see the amazing scenery. Scenery that hasn't been scene by train passengers since the demise of the Yampa Valley Mail, the final train running on April 8, 1968.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
Rock Creek Canyon
Routt County, CO
|
122 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
When the Moffat route was originally built and the railroad was faced with Rock Creek Canyon, there were two options. Build a roughly 1,800 foot long bridge across the canyon, or build back into the canyon roughly a mile in and back out, where a fill and four tunnels could facilitate the journey. The railroad chose the latter option. The westbound Phippsburg Local has just completed that journey in and out, and is now continuing west toward Phippsburg.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
CP DS144 (West Volcano)
Routt County, CO
|
147 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
At the west end of Volcano, UP 6038 and UP 6543 lead 38 covered hoppers west on the Craig Branch. Volcano is the longest siding between Bond and Phippsburg, at 7,470 feet in length. It was a common place for coal loads to meet empties 20 years ago, when multiple coal trains were loaded a day on the branch. Today, the siding sits empty, no meets being required. Note the classic Denver and Salt Lake searchlight signals. It is not worth the investment from UP to upgrade the signals on this, the least-used stretch of mainline track with CTC in the country. Its almost surprising that UP hasn't shut down the CTC in favor of track warrants.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
Dell
Eagle County, CO
|
162 (Add a Comment)
|
|
|
Glenwood Springs (UP)
|
Amtrak
|
Over the course of the (roughly) 36 miles of the Dotsero Cutoff between West Bond and Dotsero, there are two siding for meets. When heading west, the first siding is Dell, which is located a canyon not directly visible from Colorado River Road. The east end half of the 7,430 foot long siding is straight, while the west half is on a sweeping curve. The westbound Zephyr, with Phase 7 AMTK 167 in the second position, moves toward a clear (green) signal at the west end of Dell.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
Bond to Dell
Eagle County, CO
|
160 (Add a Comment)
|
|
|
Glenwood Springs (UP)
|
Amtrak
|
The Dotsero Cutoff is one of the newest stretches of significant mainline in Colorado. "Newest", in this case, is relative as the cutoff was completed in June 1934. The cutoff created a vital connection between Denver and Salt Lake City, eliminating the need for trains from Denver to run south to Pueblo and west over Tennessee Pass. 175 miles were cut out of the old route. Here, the eastbound Zephyr winds along the Colorado River near the east end of the cutoff under dramatic skies.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, September 8, 2024
|
Kevin Morgan
|
|
|
Bond to Dell
Eagle County, CO
|
140 (Add a Comment)
|
|
|
Glenwood Springs (UP)
|
Union Pacific
|
This westbound oil train was tied down in the east siding at Bond for about two hours while waiting for a relief crew from Yampa. After meeting the eastbound Zephyr at the west end of Bond, the empty train has clear (green) signals for the foreseeable future as there are no other eastbounds nearby. The train is wrapping around one of the many curves along the Colorado River, currently between Bond and Dell.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|