This was the one and only time I personally saw tunnel motors assisting an eastbound manifest up the western slope of Soldier Summit. Soon after the year 2000, DPU came to Utah and the tunnel motors were no longer needed. Here, they push on the back of the MRODV on main two at Gilluly.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
DRGW 5360 has some pretty bad scorching under the dynamic brake intakes…I think it adds to the unit personally! Right now, 5360 is helping push the eastbound MRODV up the west slope of Soldier Summit.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
SP 5350, once DRGW 5350 prior to being repainted in 1995, assists in the push through the loops at Gilluly.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
DRGW 5342 pushes on the back of the MRODV on main two while it passes under US 6. Note the engineer in the cab of 5342.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
It was not uncommon in the late 1990's to find manned helpers (based out of Helper) assisting eastbound manifest, such as the MRODV, over Soldier Summit. Here, DRGW 5360, SP 5350, and DRGW 5342 push on the back of the MRODV near Detour.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
The summer of 1999 would be the last summer more than a dozen tunnel motors could be found in Helper. They quickly began to leave at the start of the 21st Century...and quickly began to be patched, painted, or retired.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
Late afternoon sun peaks out behind clouds to the west, making for a very dramatic picture as storm clouds in the east prepare to drop a lot of rain! Meanwhile, a dozen tunnel motors idle in the yard at Helper.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
Once a Rio Grande tunnel motor, SP 5399 retained the number it had when it wore black and gold. It was repainted in 1995, but notice that a small "DRGW" was stenciled on the cab beneath the number.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
In the summer of 1999, 14 Grande tunnel motors were based out of Helper. Many were still being used as helpers on westbound coal loads. Here, three of them (5374, 5406, and 5342) sit near the silver engine house in the early evening.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
While this is not the best shot in the world, the point is will conveyed! Six tunnel motors, all wearing black and gold, work hard in the middle of a westbound coal load near the Willow Creek power plant.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A string of SEVEN Grande tunnel motors (SP 5399 was a Grande tunnel motor) are cut into the middle of a westbound coal train coming from CV Spur. The units will assist the train west to the top of Soldier Summit.
Email Questions or Comments to the Webmaster
or add a comment to the picture.