ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Photo ID: 106476
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Barbara's Gulch (MP 15.9 to MP 17.2)
Arvada, CO
1282
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
At the west end of Barbara's Gulch, a westbound rail train grinds up the grade toward a Diverging Approach (red over yellow) signal at the east end of Rocky.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 106477
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Barbara's Gulch (MP 15.9 to MP 17.2)
Arvada, CO
1378
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
A pair of SD70Ms lead a westbound rail train in Barbara's Gulch. The train is about to pass underneath CO-93 whose bridge was replaced about 15 years ago. The old bridge did not have a chain link fence along the road and allowed for photos from above the bridge.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 106478
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Barbara's Gulch (MP 15.9 to MP 17.2)
Arvada, CO
1153
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
Rail trains are actually quite cool as they transport welded rail. For those that are unaware, each rail that you see on this train is a single piece of steel about a quarter of a mile long. Each rail runs the length of the entire rail train. The rail simply bends around curves as the train moves down the track.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 106479
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Plain (6,530 ft)
Arvada, CO
1293
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
A westbound rail train approaches the grade crossing at Plain. The rail was "rolled" at the steel mill in Pueblo and the rail is headed for Talure, CA, just north of Bakersfield.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 106480
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Plain (6,530 ft)
Arvada, CO
1294
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
I'm always a sucker for a shot of any SD70M! UP purchased 1000 of them in a single order in 2000 and added on to that order with a few hundred more. UP 4073 is one of the older SD70Ms on the roster.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 106481
Date Shot
Photo By
Wednesday, February 22, 2017 Kevin Morgan
Location
Times Viewed
Plain (6,530 ft)
Arvada, CO
1231
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
Ever wonder how rail is transported from the mill to its destination? This is it! A train allows rail to be stacked 10 wide and 5 high, for a total of 50 strips of rail. With each strip roughly 1/4 mile long, that means the train has 12 1/2 miles of rail. Of course, there are two rails to make up the tracks, so that is 6 1/4 miles of track on this train. That is enough to replace all the rail in the Moffat Tunnel.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.