|
|
|
|
|
Friday, January 13, 2017
|
Kevin Morgan
|
|
|
|
Leyden (7,020ft)
Arvada, CO
|
1255 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
UP's DS-86 set up great rolling meet at Leyden between the westbound Zephyr (on the main) and an eastbound coal load (on the siding). If you are unfamiliar with the term "rolling meet", this refers to two trains meeting at siding in which neither train actually has to come to a stop. By the time the coal train reached the east end of the siding, they had a clear signal. Same thing for the Zephyr at the west end.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Sunday, January 8, 2017
|
Kevin Morgan
|
|
|
|
Tolland (9,356 ft)
Tolland, CO
|
2346 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
|
You couldn't ask for better weather conditions when the subject of your picture is the Winter Park Express Ski Train! Amtrak F40PH #406 (now technically an NPCU) leads the eastbound train through blowing snow in the rapidly fading light at Tolland.
If you are unfamiliar with the term NPCU, it refers to a Non-Powered Cab Unit. This F40PH no longer has a prime mover under the hood. The cab itself is still unaltered though, complete with a control stand. The control stand remotely controls the P42DCs on the other end of the train. So, when climbing a grade, the train is actually being pushed up the grade (when in this configuration), not pulled.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Saturday, January 7, 2017
|
Kevin Morgan
|
|
|
|
Arvada Siding (MP 6 to MP 7)
Arvada, CO
|
1926 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
Back when the old Ski Train was running, the train would be wyed (turned around) at Tabernash. Eight years later, however, finds the wye at Tabernash out of service. Amtrak's solution is to place AMTK 406 on the east end of the train. This former F40PH is now a NPCU, or Non-Powered Cab Unit. It still has a control stand in the cab, but no prime mover. Instead, when the engineer works the controls, the commands are sent to the P42DCs on the west end of the train. So the train will actually be pushed up the grade from Fraser to Winter Park, but the engineer will still be on the east end of the train.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|