ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 111369
Date Shot
Photo By
Sunday, December 1, 2024 Kevin Morgan
Location
Times Viewed
Prospect Jct to Fox Jct (MP 1.0 to MP 1.5)
Denver, CO
257
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Running pretty much right on time, the morning Zephyr has left Denver Union Station behind and is continuing its trip west toward California. The train is on UP's Main 2 between Prospect Jct and Fox Jct. Between those control points, a distance of about a mile, UP has two main tracks. You can just see Main 1 on the far right side of the shot. The yard tracks are BNSF and part of Rennicks (intermodal) yard.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111359
Date Shot
Photo By
Wednesday, November 27, 2024 Kevin Morgan
Location
Times Viewed
Eisele to Plain (MP 21.8 to MP 24.0)
Arvada, CO
358
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Just west of Blue Mountain Drive and the hotbox detector at MP 22.6, the westbound Zephyr is having no issues moving along at track speed in the continually-falling snow. Without question, passengers aboard the Zephyr are going to have a better experience on the trip west today compared to folks driving in the high country on I-70!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111358
Date Shot
Photo By
Wednesday, November 27, 2024 Kevin Morgan
Location
Times Viewed
Blue Mountain Drive (MP 22.43)
Arvada, CO
357
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
AMTK 140 and AMTK 207 have the duty to lead the westbound Zephyr this morning. The train is approaching the Blue Mountain Drive grade crossing in a winter wonderland as fresh snow continues to fall.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111357
Date Shot
Photo By
Wednesday, November 27, 2024 Kevin Morgan
Location
Times Viewed
Blue Mountain Drive (MP 22.43)
Arvada, CO
389
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A pretty substantial snow storm has set in along the Front Range. A total of 5-6 inches (12-15 cm) is forecast to fall, with right around 3 inches (7 cm) having fallen so far. The westbound Zephyr is indifferent to the snow, however, as it approaches the Blue Mountain grade crossing, moving along at track speed.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111356
Date Shot
Photo By
Monday, November 25, 2024 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
262
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
AMTK 168 and AMTK 81 lead the westbound Zephyr along the north edge of Big Ten Curve. It is the week of Thanksgiving, so the Zephyr is probably pretty booked with passengers making their way to friends and family for the holiday on Thursday.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111355
Date Shot
Photo By
Monday, November 25, 2024 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
260
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Just west of Rocky, the Zephyr is making its way up the roughly 2% grade of Big Ten Curve. As the elevation slowly increases, so does the morning frost, clinging to the foliage. In short order, the frost will completely melt under the morning sun.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111354
Date Shot
Photo By
Monday, November 25, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, Co
276
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A fairly decent sized herd of elk are enjoying the morning on the north side of the rails. The engineer let the conductor know so, in turn, the conductor could announce the herd to the passenger so they could try to get a view of them. The Zephyr is on time on the main at Rocky.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111353
Date Shot
Photo By
Monday, November 25, 2024 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
190
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
90 minutes before this picture was taken, there was a thick layer of low clouds completely obscuring this view. The cold also contributed to a bit of frost that has formed on a lot of the foliage. The sun has now burned off the clouds as the morning Zephyr charges west on the main at Rocky alongside the house track.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111352
Date Shot
Photo By
Wednesday, November 20, 2024 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
277
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The wind is only gusts to about 15 MPH right now. However, the forecast says there could be wind gusts of up to 40 MPH. Consequently, UP currently has a 10 MPH slow order around Big Ten Curve. The Zephyr is creeping along on the south end of Big Ten now, running about 10 minutes early. When departing Denver, the Zephyr usually has to realign some switches behind it. That was not the case today, allowing the train to get out of Denver quickly.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111351
Date Shot
Photo By
Wednesday, November 20, 2024 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
314
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The morning Zephyr is actually running a few minutes early as it makes its way around the open hoppers serving as a wind break on Big Ten Curve. These hoppers have been here for over fifty years, and will likely remaining for decades...if not centuries...to come.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111350
Date Shot
Photo By
Wednesday, November 20, 2024 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
390
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
As we continue to closer to the shortest day of the year, now about a month away, the tracks around Big Ten Curve are closer to being in the shadows in the morning as the Zephyr climbs westbound.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111349
Date Shot
Photo By
Wednesday, November 20, 2024 Kevin Morgan
Location
Times Viewed
CP DS016 (East Rocky)
Arvada, CO
384
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
AMTK 170 and AMTK 82 leads the westbound Zephyr through a clear (green) signal at the east end of Rocky. AMTK 82 is, of course, sporting the new Phase 7 paint scheme. This is the first non-Phase 5 unit on the Zephyr in at least a couple of weeks.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111318
Date Shot
Photo By
Sunday, November 17, 2024 Kevin Morgan
Location
Times Viewed
Tunnel 19 (MP 32.1, 1,059 ft)
Boulder County, CO
293
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Just at the east portal of Tunnel 19, the westbound Zephyr crosses over a fill and prepares to start the upper end of the Tunnel District. In the distance, construction continues on the dam at Gross Reservoir. The dam is being raised by 131 feet to triple the capacity of the reservoir.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111317
Date Shot
Photo By
Sunday, November 17, 2024 Kevin Morgan
Location
Times Viewed
CP DS032 (West Crescent)
Boulder County, CO
206
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
At the west switch of Crescent, the westbound Zephyr appears from around the bend on the main track, knocking down a clear (green) signal.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111316
Date Shot
Photo By
Sunday, November 17, 2024 Kevin Morgan
Location
Times Viewed
Eisele to Plain (MP 21.8 to MP 24.0)
Arvada, CO
358
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Two elephant-style P42DCs lead a typical Zephyr consist west on the climb toward Tunnel 1 from the base of Coal Creek Canyon. So far, no construction has started on any houses in the new Canyon Pines neighborhood, the main road for which is just visible along the top of the frame.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.