|
|
|
|
Sunday, November 17, 2024
|
Kevin Morgan
|
|
|
CP DS005 (C&S Junction)
Denver, CO
|
95 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
The conductor on this single SD70ACe looks out the window as the unit backs across Federal Blvd on Main 1. The unit will be added to the point of a westbound empty oil train. A few years ago, UP laid off all of the engine hostlers in Denver. These hostlers would make sure power changes like this were done before the road crew showed up. Now, the road crew is responsible for doing all these power shuffling activities before departing the yard.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, November 17, 2024
|
Kevin Morgan
|
|
|
CP DS005 (C&S Junction)
Denver, CO
|
82 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
A single UP SD70ACe sits on Main 1 just west of the signals at the C&S Junction. Before unit trains (mostly oil trains these days, coal trains in the past) head west on the Moffat, UP frequently will do a little power shuffling. Often times adding a unit to a train that came off the relatively flat plains before it heads into the Rockies. Such is the case here as this SD70ACe is waiting for authority from DS-378 to back east onto the point of a westbound oil train, just barely visible way off in the distance. This shot also demonstrates how long the OS at C&S Junction is. It must be one of the longest anywhere, as it is roughly 1/2 a mile between switches!
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, November 3, 2024
|
Kevin Morgan
|
|
|
CP DS005 (C&S Junction)
Denver, CO
|
94 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
The morning Zephyr passes underneath the signal bridge at C&S Junction. The Zephyr is running right on time as it charges west on Main 3 (changing to Main 2 here at C&S). Four tracks collapse down to just two when heading westbound here at C&S. The four tracks, from left-to-right, are Bypass (Main) 1, Bypass (Main) 2, Main 3, and the North Yard Siding. The two tracks in the foreground, from left-to-right, are Main 1 and Main 2.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Monday, July 8, 2024
|
Kevin Morgan
|
|
|
CP DS005 (C&S Junction)
Denver, CO
|
143 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
After a layover in Denver on Bypass 1 at North Yard, UP 1943 and its empty westbound oil train is departing on Main 1 at C&S Junction. The four tracks east of C&S Junction, from left to right, are Bypass 1, Bypass 2, Main 3, and the North Yard Siding. At C&S Junction, when heading west, these filter down to just two tracks. From left to right, we have Main 1 and Main 2.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|