ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 108979
Date Shot
Photo By
Thursday, February 16, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
345
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Just west of Tunnel 1, the Zephyr snakes through an S-Curve amidst a snowy Front Range. The Zephyr has a pretty typical consist this morning. Two P42DCs, a baggage car, and seven Superliners (a transition sleeper, two sleepers, a diner, a longue car, and two coaches).
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108978
Date Shot
Photo By
Thursday, February 16, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
489
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
There isn't a cloud in the sky on this chilly February morning as the westbound Zephyr, running about 30 minutes late, climbs toward Tunnel 1 in a snowy winter wonderland. The lack of cloud cover has resulted in a nose dive in temperature, with it only being 14°F (-10°C) outside. It would be hard to be the view looking out of the Zephyr then on a morning like this.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108973
Date Shot
Photo By
Monday, February 13, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
531
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Rocky Mountaineer
Two Rocky Mountaineer GP40-3s...the two based in Denver for the "Rockies to the Red Rocks" train...emerge as light power from Tunnel 1. the units are likely part of crew training in advance of the start of 2023 season that kicks off in April.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108972
Date Shot
Photo By
Monday, February 13, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
489
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Rocky Mountaineer
I caught wind of a possible Rocky Mountaineer movement westbound and was hoping to possibly catch the full trainset. As it turns out, I had to settle for just the pair of GP40-3s. Most likely, the crew is making a training run west to Glenwood Springs. Even though it was only the two units, it was different from something orange, yellow, or Amtrak!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108945
Date Shot
Photo By
Tuesday, January 24, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
449
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
This should have been yesterday's eastbound Zephyr arriving in Denver, but due to a number of factors, the train is running a massive 17 hours late as it emerges from Tunnel 1 with 50th Anniversary unit AMTK 161 leading!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108928
Date Shot
Photo By
Friday, January 20, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
439
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
On the west side of Tunnel 1, the Zephyr passes by the Canyon Pines development, which has seen some significant progress in the past six months. Once complete, the neighborhood is set to include 180 new single family homes.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108927
Date Shot
Photo By
Friday, January 20, 2023 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
417
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The westbound Zephyr climbs the (roughly) 2% grade up from Coal Creek Canyon and toward the east portal of Tunnel 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108918
Date Shot
Photo By
Sunday, December 18, 2022 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
500
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
As BNSF's Denver-Provo turns toward the east portal of Tunnel 1, note the line of asphalt near the top of the frame. This is part of the construction of the new Canyon Pines subdivision. The development covers 180 acres and, when finished, will have about 90 single-family homes running up and over the top of Tunnel 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108917
Date Shot
Photo By
Sunday, December 18, 2022 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
439
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Just west of the Coal Creek Canyon overpass, BNSF's Denver-Provo is charging up the roughly 1.75% grade toward the east portal of Tunnel 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108871
Date Shot
Photo By
Tuesday, October 11, 2022 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
521
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The westbound Zephyr emerges from Tunnel 1 on a beautiful October morning. The Zephyr is a little more colorful this morning as the "Pepsi Can" P42DC, AMTK 160, is second out on the headend. The scenery is trying to help out as well as fall colors are reaching their peak here along the front range.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108851
Date Shot
Photo By
Thursday, February 24, 2022 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
551
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
There are few scenes as beautiful as the one seen here, with a fresh layering of snow not only on the ground, but still in the trees, creating that powdered sugar look. A pair of P42DC, including AMTK 130 (Phase I heritage unit) keep the Zephyr rolling west on time just west of Tunnel 1.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108850
Date Shot
Photo By
Thursday, February 24, 2022 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
729
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
On a clear, cold morning after a February blizzard, the westbound Zephyr climbs toward the east portal of Tunnel 1 in a frozen winter wonderland. AMTK 130, the Phase II heritage unit, is second up on the train today. February is generally the coldest month of the year in Colorado and this day is no exception as the temperature is only 2°F (-17°C)!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108847
Date Shot
Photo By
Thursday, November 11, 2021 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
731
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The morning Zephyr climbs toward Tunnel 1 on a beautiful, albeit blustery, morning. If you look in the background, you might notice a bit of a gash in the hillside in the background. This is part of a new neighborhood, called Canyon Pines, that has just started construction. The neighborhood will include houses up to and even on top of Tunnel 1!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108809
Date Shot
Photo By
Sunday, September 26, 2021 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
715
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
After meeting the westbound Zephyr at Plain, this eastbound coal load is on the roll, approaching the west portal of Tunnel 1. This coal train is a bit odd as it is only about half the length of a typical coal load. In addition, the third unit on the head end is an SD70M. DC units are pretty rare on coal loads these days.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 108808
Date Shot
Photo By
Sunday, September 26, 2021 Kevin Morgan
Location
Times Viewed
Tunnel 1 (MP 23.4, 366 ft)
Arvada, CO
739
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A pair of P42s leads a baggage car and seven Superliners in what is essentially a normal configuration for the Zephyr as everyone slowly tries to return to a post-COVID normal. The Zephyr is about to disappear in to Tunnel 1, heading in to the Tunnel District.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.