|
|
|
|
Sunday, June 16, 2024
|
Kevin Morgan
|
|
|
South Platte River
Denver, CO
|
122 (Add a Comment)
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
UP's MNYGR (Manifest, North Yard, CO to Green River, WY) departs from North Yard six days a week, typically departing right after the Zephyr and, when necessary, the Rocky Mountaineer have passed by. Here, the train is crossing over the South Platte River on the Belt Industrial Lead. The lead connects North Yard to the Greeley Sub.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, April 14, 2024
|
Kevin Morgan
|
|
|
CP DS900 (Broadway)
Denver, CO
|
158 (Add a Comment)
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
UP's MNYGR (Manifest from North Yard, CO to Green River, WY) is pulling east on to the Belt Industrial Lead across Broadway, out of North Yard. The train has been put together (after doubling over between two tracks) and the North Yard Utility personnel have just detached from the train. Time to head north! Any cars destined for Salt Lake City that once would have run on the (now defunct) MNYRO are on this train instead.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, December 31, 2023
|
Kevin Morgan
|
|
|
CP DS902 (Broadway)
Denver, CO
|
207 (Add a Comment)
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
Trains departing UP's North Yard to the east do so on the Belt Industrial Lead. About a half mile east from the yard, this manifest is approaching the control point at Broadway. It is here that the Bypass tracks (visible to the right) converge with the Belt Lead. The Bypass tracks were built around 2004 as a shortcut for coal trains that did not need to enter North Yard. Note the old water tank at Utah Junction visible in the distance to the right.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, November 26, 2023
|
Kevin Morgan
|
|
|
CP DS901 (Stock Yards)
Denver, CO
|
276 (Add a Comment)
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
An eastbound UP oil train rolls through CP DS901 (Stock Yards) on the 4-mile long Belt Industrial Lead which connects North Yard to UP's Greeley Sub and Limon Sub. The train is passing by Xcel Energy's Cherokee Power Plant. The plant generates 928 megawatts of power for the Denver area. It was built as a coal-burning plant in 1968, that was served by Rio Grande (and later SP and UP) for decades. However, in 2017, the plant converted to natural gas and has not burned coal since.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, October 8, 2023
|
Kevin Morgan
|
|
|
CP DS901 (Stock Yards)
Denver, CO
|
214 (Add a Comment)
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
UP 5929 is running across the 4 mile long Belt Industrial Lead that connects the Greeley Subdivision to North Yard and the Moffat Tunnel Sub, as well as the Joint Line to the south. The train is approaching the Stock Yards control point. The track at the bottom of the screen runs south and serves many customers in the area. In the background stands Xcel Energy's Cherokee Generating Station. It was powered by coal for decades, but for the several years now it is powered by natural gas.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|