|
|
|
|
|
Sunday, December 31, 2023
|
Kevin Morgan
|
|
|
|
CP DS902 (Broadway)
Denver, CO
|
434 (Add a Comment)
|
|
|
|
|
Belt Industrial Lead (UP)
|
Union Pacific
|
Trains departing UP's North Yard to the east do so on the Belt Industrial Lead. About a half mile east from the yard, this manifest is approaching the control point at Broadway. It is here that the Bypass tracks (visible to the right) converge with the Belt Lead. The Bypass tracks were built around 2004 as a shortcut for coal trains that did not need to enter North Yard. Note the old water tank at Utah Junction visible in the distance to the right.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Sunday, December 31, 2023
|
Kevin Morgan
|
|
|
|
North Yard
Denver, CO
|
372 (Add a Comment)
|
|
|
|
|
Yard Shots
|
Union Pacific
|
North Yard in Denver was originally built by the Denver and Salt Lake. It then went to the Rio Grande, followed by Southern Pacific, and now, Union Pacific. There are around 25 yard tracks in North Yard. As you can see, there are cars on most of the tracks, although many of the tracks are not particularly full. If you note the light blue building in the distance (with one white door and one blue door)...this was the car repair facility (called the RIP facility - Repair In Place). On December 5, 2023, UP management decided to close the shop. 13 car repairmen were immediately laid off and escorted off the property! No more car repair facilities in Denver. North Platte is now the closest for repairs.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Wednesday, December 20, 2023
|
Kevin Morgan
|
|
|
|
Granby (7,325 ft)
Granby, CO
|
331 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
If you look a bit in the background of this oil train, you'll notice a bend in the tracks to the left. Indeed, you might notice that the main track where the back half of this train is looks to align perfectly with the siding on the far side of the bend. You'd be correct as, until sometime around 1990, there were actually two sidings at Granby. An east siding and a west siding. Each was about 4,700 feet long. The two siding were ultimately combined to make a single 7,325 foot long siding (and main) that exist today.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|