100 covered hoppers of grain work their way south with three elephant-style C44-9CWs. The second and third units wear the warbonnet paint scheme, the second of which is still an unpatched Santa Fe unit!
Email Questions or Comments to the Webmaster
or add a comment to the picture.
The town of Castle Rock is preparing to widen Interstate 25. To accomodate the wider highway, a new bridge for the northbound main (main two) is currently being constructed. Note the SP logo on the bridge.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A northbound manifest led by two C44-9CWs, the second of which wears the warbonnet paint scheme.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
After stopping to let the four units on the loaded coal train cool off, the southbound continue from Spruce towards the top of the hill at Palmer Lake, CO.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
Just south of Sedalia along Highway 85, a BNSF northbound moves slowly through a slow order on main two. The coal empty has an unusual four units up front.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
An eastbound BNSF grain empty makes its way through Arvada just before sunset at 5:10pm on a beautiful Autumn afternoon.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
BNSF 4007 west is on the siding and UP 6419 (ex-SP 373) east have a rolling meet at the siding of Plain.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
With Stanley Lake in the background, this BNSF manifest is exiting Barbara's Gulch and entering the siding of Rocky on its journey west towards Stockton, CA.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A unit grain train with two H2 C44-9CW's and a green SD40-2 are about to leave the single track behind and start on main two for the trip back to Denver.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
When Santa Fe and Rio Grande competed to get to Denver from Pueblo (prior to the Joint Line), there were three spots where the two lines crossed each other with a grade separation. Crews is one such spot. The Rio Grande trackage passed underneath the Santa Fe trackage. Here, a BNSF northbound unit grain train is heading toward Denver.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
In the late 1980's, Santa Fe ran a hot intermodal train between Big Lift (south of Denver) and La Juanta. It was called DVLJ (and LJDV). One common source of power were GP39-2's like this one! Nearly 20 years later, this unit is being used as the Colorado Springs switcher.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A southbound coal load creeps past this wonderful curve just north of Sedalia on the Joint Line. There are four SD70MAC's on the coal train and it is moving at a slow 14 MPH.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
After doing some switching at the switch facility at Big Lift (just south of Denver), this manifest is throttling up to continue south towards Pueblo on the Joint Line.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
A manifest running from Denver to Pueblo (with three pumpkins on the point) is moving slow at Greenland. The manifest is right on the heals of a heavy, slow-moving coal load. Thus, the manifest is moving at restricted speed. A thunderstorm is brewing in the background.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
BNSF 5698, a GE AC4400CW make a rare appearance on the head-end of a BNSF coal empty. The temperature here at Palmer Lake was around 40 degrees, and your breath could clearly be seen, two days prior to the first day of summer.
Email Questions or Comments to the Webmaster
or add a comment to the picture.