ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 111284
Date Shot
Photo By
Thursday, November 7, 2024 Kevin Morgan
Location
Times Viewed
Arvada to Leyden (MP 7.5 to MP 11.9)
Arvada, CO
497
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Just east of Leyden, a trio of GEs leads a relatively short Provo-Denver manifest eastbound toward Denver. The manifest is right around 4,000 feet long. Most BNSF manifest are, on average, right around a mile long. The scene is a cool mix of fall and winter mixed together as many trees and shrubs still retain their red and yellow leaves. It has been a few years since this much snow has fallen in early November.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111283
Date Shot
Photo By
Thursday, November 7, 2024 Kevin Morgan
Location
Times Viewed
CP DS012 (East Leyden)
Arvada, CO
390
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF's Provo-Denver departs from the east end of Leyden on an Advanced Approach (flashing yellow) signal. Three units lead the manifest by a tree that is still sporting fall colors as a lot of snow falls.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111276
Date Shot
Photo By
Tuesday, November 5, 2024 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
311
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
An AC4400CW and a (increasingly rare) "green and cream" SD70MAC bring up the tail end of BNSF's Provo-Denver manifest on the main at Leyden. The train passes by a string of empty gondolas, currently tied down for long term storage in the siding.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111275
Date Shot
Photo By
Tuesday, November 5, 2024 Kevin Morgan
Location
Times Viewed
CP DS012 (East Leyden)
Arvada, CO
259
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
An eastbound BNSF manifest knocks down the signal at the east end of Leyden, now in the final 12 miles of its journey from Provo, UT to Denver, CO.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111274
Date Shot
Photo By
Tuesday, November 5, 2024 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
266
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
It has been a little while since I have seen one of these 25th Anniversary "sticker units". Union Pacific, Norfolk Southern, and CSX have all created heritage unit. Depending on the railroad, these units are either exact replicas for previous railroads, or artistic variations of previous railroads. BNSF has, to date, not created any heritage units. In 2020 (the 25th anniversary of BNSF), they did release ten of these units that sport the heralds of many of the railroads that ultimately went in to making up BNSF.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111272
Date Shot
Photo By
Tuesday, November 5, 2024 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
284
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Nine BNSF units and a single Ferromex unit are all on the point of an eastbound Provo-Denver manifest on the main at Leyden. Only the first three units are actually online (working). The trailing five are just along for the ride! The train is approaching an Advanced Approach (flashing yellow) at the east end of Leyden.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111271
Date Shot
Photo By
Tuesday, November 5, 2024 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
264
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF's Provo-Denver has a long string of power this morning as it roles through Leyden. Eight units on the point, only three of which are online, and two DPUs on the end. The snow that fell 24 hours prior has melted below about 6,000 feet, but snow still clings to the foothills in the distance.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111259
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Clear Creek
Denver, CO
361
(Add a Comment)
Subdivision
Railroad
Front Range (BNSF) BNSF
An SD40-2 and a GP38-2 work to switch out a string of double stack cars at BNSF's intermodal facility at Rennicks. The long stretch of cars necessitates the job pulling north onto the BNSF Front Range Subdivision alongside RTDs Pecos Junction commuter line station. While the train is technically on the mainline, this part of the mainline is still within yard limits, so no coordination with BNSF's Front Range Dispatcher is necessary.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111258
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Utah Jct to Pecos X-Over (MP 3.2 to MP 4.0)
Denver, CO
318
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
A pair of SD70ACes bring up the tail end of BNSF's Provo-Denver manifest as it passes by the north end of UP's North Yard on the main track. Several decades ago, the open dirt area to the right was used for loading and unloading an intermodal train that ran between North Yard and Salt Lake City. Alas, all such trains these days run on the Greeley Sub to the Overland Route rather than over the Moffat, as some of the tunnels on the Moffat are not high enough to accommodate double stacks. Speaking of double stacks, note the BNSF yard job, switching around some double stacks at BNSF's Rennicks Yard.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111257
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
CP DS003 (Utah Junction)
Denver, CO
284
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific, BNSF
There is quite a bit happening in this picture! First, the train passing under the signal bridge to the right is UP's MGJNY. Coming off the Moffat, the train is entering in Track 5 here at North Yard for classification. Next to it, the train on the left under the signal bridge is BNSF's HPVODEN, coming from Provo, UT. This train had been following the MGJNY just a few blocks back since Cliff and, out of necessity, is now passing it here in Denver. Meanwhile, a BNSF yard job is working on building a double stack train to the left, with the classic EMDs kicking up exhaust like they should be Alcos! The track crossing perpendicular to many of the other through the scene is the Belt Industrial Lead which leads to UP's Greeley Sub.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111256
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
C&S Jct to Arvada (MP 4.8 to MP MP 7.5)
Denver, CO
282
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Even at the start of November, there is still quite a bit of fall color to be seen around the Denver-Metro area. Trees and shrubs just west of Pecos are showing off their yellows as a C44-9W leading two SD70ACes on the point of the BNSF Provo-Denver rolls slowly by on Bypass (Main) 2, approaching a diverging approach signal ahead at Pecos Crossover.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111255
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Pecos X-Over to C&S Jct (MP 4.0 to MP 4.8)
Denver, CO
306
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
An eastbound BNSF Provo-Denver, with elephant-style GEs on the point, approaches the I-76 overpass between C&S Junction and Pecos Crossover. The train would normally be on Main 3 (second from the right), but UP's MGJNY arrives just minutes earlier and is working on getting into North Yard. To avoid delaying this train, DS-378 aligned it east on Bypass (Main) 2. At Pecos Crossover, the train will move to Main 3 to continue east to BNSF's 31st Street Yard.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111251
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Irondale
Adams County, CO
401
(Add a Comment)
Subdivision
Railroad
Brush (BNSF) BNSF
Four ES44s (a mix of ES44ACs and ES44C4s) lead an extremely long intermodal train that is actually originating from the Logistics Center Hudson, about 30 miles northeast of Denver. The massive train is headed for the piers in Long Beach, CA.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111250
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Hudson to Keensburg
Keensburg, CO
331
(Add a Comment)
Subdivision
Railroad
Brush (BNSF) BNSF
A pair of SD70ACes bring up the back of a westbound loaded coal train moving away from the camera. With very few exceptions, BNSF coal trains run in a 2x2 configuration, and this train falls right in to that standard category.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111249
Date Shot
Photo By
Sunday, November 3, 2024 Kevin Morgan
Location
Times Viewed
Hudson to Keensburg
Keensburg, CO
466
(Add a Comment)
Subdivision
Railroad
Brush (BNSF) BNSF
A coal load from the Powder River Basin in Wyoming is likely headed for a power plant somewhere in Texas. The train will continue west on the Brush Sub to Denver before turning south on the Joint Line, down in to Texas.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.