ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 111695
Date Shot
Photo By
Sunday, January 5, 2025 Kevin Morgan
Location
Times Viewed
Fraser (4,830 ft)
Fraser, CO
72
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF 9039 is the last unit on a train that had an all EMD consist as it crosses Eisenhower Drive. Plenty of fresh powder is being kicked up by the train as it climbs the roughly 2% grade toward the Moffat Tunnel.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111694
Date Shot
Photo By
Sunday, January 5, 2025 Kevin Morgan
Location
Times Viewed
Winter Park to Fraser (MP 58 to MP 62)
Fraser, CO
97
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF 9051 and train are crossing over Fraser Valley Parkway. The road leads to, among other things, the Fraser Tubing Hill. Another popular winter destination for people, particularly those that do not ski or snow board. It is currently around 20°F (-7°C). Fortunately, there is no wind, so the temperature doesn't feel too bad.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111693
Date Shot
Photo By
Sunday, January 5, 2025 Kevin Morgan
Location
Times Viewed

Fraser, CO
96
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF's Provo-Denver is kicking up some snow as it moves west up the 2% grade between Tabernash and the Moffat Tunnel. Of note, the train has a long string of empty well cars in the consist today.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111692
Date Shot
Photo By
Sunday, January 5, 2025 Kevin Morgan
Location
Times Viewed

Fraser, CO
91
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Three BNSF SD70ACes lead an eastbound manifest, the Provo-Denver, on the mainline at Fraser. The train is passing by the eastbound Winter Park Express Ski Train, tied down in the siding, awaiting for its time to move to the platform to pick up passengers at 3:45pm or so.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111691
Date Shot
Photo By
Sunday, January 5, 2025 Kevin Morgan
Location
Times Viewed

Fraser, CO
79
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
After meeting both the westbound Zephyr and a UP oil empty at Tabernash, this BNSF Provo-Denver is now getting its turn to run through Fraser. It just knocked down a clear (green) signal at the west switch of Fraser. You can see all the way back to Tabernash, way off in the distance.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111638
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
CP DS019 (West Rocky)
Arvada, CO
131
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
A final closing shot for the day as a pair of BNSF's DPUs bring up the tail end of the Provo-Denver. You can see the control point name, "DS016 Rocky" clearly on the signal control box here at the east end of Rocky. The train is disappearing around the bend into Barbara's Gulch.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111637
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
CP DS019 (West Rocky)
Arvada, CO
102
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
With only (roughly) 17 miles to go until reaching the yard, this eastbound BNSF manifest leaves Rocky behind and starts into the narrow west end of Barbara's Gulch. Not far ahead, the top speed for freight trains will increase, and the train should make good time from here on in to Denver.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111636
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
127
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
This is a classic shot from the Moffat, but one that I never really get tired of! This eastbound BNSF manifest is on clear (green) signals on the main at Rocky. The DPUs at the end of the train are headed geographically north, but will soon wrap through Little Ten Curve, following the rest of the train eastbound.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111635
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Blue Mountain Drive (MP 22.43)
Arvada, CO
97
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Just before 2pm, BNSF's Provo-Denver is making its way through the multiple curves between Tunnel 1 and the west end of Eisele (Clay). Although there are six units on the head end, only three of them are actually online. The trailing three are all catching a ride on the train this afternoon.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111634
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Blue Mountain Drive (MP 22.43)
Arvada, CO
97
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
BNSF 9037 is blowing its horn as it approaches the grade crossing at Blue Mountain Drive, rolling along at track speed. In the distance, you can clearly see the back half of the train, still descending from Tunnel 1 on the other side of CO-72.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111633
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Eisele to Plain (MP 21.8 to MP 24.0)
Arvada, CO
81
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Six units lead BNSF's Provo-Denver manifest out of Tunnel 1 and down the hill toward the base of Coal Creek Canyon. The conductor has his window open on BNSF 9037 as it is actually unseasonably warm here. Temperatures are right around 50°F (10°C) this afternoon!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111632
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Eisele to Plain (MP 21.8 to MP 24.0)
Arvada, CO
106
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
East of Plain, this BNSF manifest snakes through the S-Curves leading it to the west portal of Tunnel 1. From this vantage point above Tunnel 1, we can look back in the distance and see most of the City of Boulder. BNSF's Front Range Subdivision runs through middle. You can also find the University of Colorado (Boulder) there!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111631
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Cliff (6,900 ft)
Glipin County, CO
130
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
Crossing over South Boulder Creek, two DPUs bring up the tail end of the Provo-Denver at Cliff. A pair of units DPU'd on the back of a manifest is pretty standard for BNSF manifests running on the Moffat.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111630
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Cliff (6,900 ft)
Gilpin County, CO
110
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
It can sometimes be a bit of a challenge, capturing trains on the Moffat in direct sunlight in the height of winter. The low sun in the sky mixed with high mountain peaks keeps a lot of the line in shadows for much of the day. Here, the lead SD70ACe comes into directly sunlight on the main at Cliff as it crosses over South Boulder Creek.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 111629
Date Shot
Photo By
Friday, January 3, 2025 Kevin Morgan
Location
Times Viewed
Cliff (6,900 ft)
Gilpin County, CO
87
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) BNSF
The western 40% or so of Cliff hugs the north side of a mountain. Throughout winter, this part of the tracks never see any directly sunlight. As a result, it is pretty common for the rails to be buried in snow for months at time. Indeed, it is quite possible the tracks will be in snow until the spring melt. Meanwhile, an eastbound BNSF manifest rolls through the darkened scene.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.