|
|
|
|
|
Monday, December 16, 2024
|
Kevin Morgan
|
|
|
|
Barbara's Gulch (MP 15.9 to MP 17.2)
Arvada, CO
|
365 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
BNSF
|
|
BNSF's strategy for powering their oil trains on the Moffat differs quite a bit from UP. UP will send westbound empty oil trains with anywhere from 2 to 6 units on the head end. When they come east, the power is usually 2 x something x something.
BNSF, on the other hand, pretty consistently run trains west with six units on the head end, and returns east on loads with three on the point and three DPUs on the end. Such is the case here, as three units lead this oil train east through Barbara's Gulch. Note the covered hoppers, which is serving as a buffer car (protection car) between the power and the oil train.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Sunday, December 15, 2024
|
Kevin Morgan
|
|
|
|
Coal Creek Canyon (MP 22.8 to MP 23.4)
Colorado Springs, CO
|
346 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
UP 2692 is headed south in the siding at Colorado Springs. The siding is a massive 20,286 feet long, nearly four miles. In fact there are two crossovers in the siding. One at Bijou (see in the distance, here), and one at Cimarron. This allows for multiple trains to use the siding simultaneously. There is roughly two miles of siding north of Bijou. Cimarron, on the other had, is less than a mile from the south end of the siding. This UP manifest will be dropping off three cars in the yard here in Colorado Springs.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Sunday, December 15, 2024
|
Kevin Morgan
|
|
|
|
CP DS000 (Prospect Junction)
Denver, CO
|
342 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
Here we are at milepost 0 here at CP DS000 (Prospect Jct). Mileposts start counting up on the Moffat Tunnel Sub (the way the camera is looking). Mileposts also start counting up south on the Joint line (behind the camera). UP's MNYPU is currently stopped on Main 1 just north of the signal protecting Prospect Jct. You can clearly still see the switch is bent toward Main 2 on the empty track. The westbound Zephyr came through here about 25 minutes earlier.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Friday, December 13, 2024
|
Kevin Morgan
|
|
|
|
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
|
340 (Add a Comment)
|
|
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
On the south edge of Big Ten Curve, the Zephyr is making its way west. The Zephyr has not seen many ALC-42 Chargers, the power set to (largely) replace the P42DCs. The Chargers are Tier-4 compliant, and they require special additives mixed in with their fuel. the infrastructure currently does not exist in Denver to include the additives, so the Chargers have not been running on the Zephyr. Rumors are that the infrastructure will be added soon, and Chargers are likely to start showing up in 2025. That means this classic consist may be short-lived.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|