|
|
|
|
Sunday, August 9, 2015
|
Kevin Morgan
|
|
|
Leyden (7,020ft)
Arvada, CO
|
1541 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
BNSF
|
On a beautiful Sunday morning, an eastbound BNSF manifest descended the Moffat with a great looking BNSF Warbonnet on the point. Most of the Dash-9 Warbonnets are in the 600-700 series. However, roughly 20 wound up in the 4700 series (4700-4719). If you noticed only one ditch light lit up, that isn't because they are oscillating...the light on the left is burned out. The train is taking the siding to meet a (slightly late) California Zephyr.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, August 9, 2015
|
Kevin Morgan
|
|
|
Lowell Blvd
Denver, CO
|
1486 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
BNSF
|
After meeting Amtrak at Leyden, DS-86 set up this BNSF manifest with a clear shot the rest of the way in to Denver. The train is on Main 2 and approaching a clear signal at C&S Junction. Although it will remain on the same physical train at C&S, it will switch from Main 2 to Main 3 and continue down to Prospect Jct where it will return to BNSF.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, August 9, 2015
|
Kevin Morgan
|
|
|
48th Avenue
Denver, CO
|
1857 (Add a Comment)
|
|
|
Brush (BNSF)
|
BNSF
|
A BNSF SD70ACe and a KCS ES44AC lead a westbound coal load down the main just outside BNSF's Denver Yard. BNSF is sinking some money in the east end of the yard in 2015. The tracks called "Coal 1" and "Coal 2" (where westbound coal train will typically stop to recrew) are being extended. They will be long enough to support 140-car trains when construction is complete. As part of the construction, a new signal bridge has been installed! The signal on the left will be for the main and the other two signals for Coal 1 and Coal 2.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, August 9, 2015
|
Kevin Morgan
|
|
|
48th Avenue
Denver, CO
|
1940 (Add a Comment)
|
|
|
Brush (BNSF)
|
BNSF
|
DPUs on a westbound coal load pass underneath a brand new signal bridge on the east edge of BNSF's Denver yard. The train is running on a new track just put in this year (2015) as part of a project to increase the length of BNSF's coal tracks. Another new track will be laid (to the left of these two in the shot) later this year.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Sunday, August 9, 2015
|
Kevin Morgan
|
|
|
Cherokee Power Plant
Denver, CO
|
1581 (Add a Comment)
|
|
|
Yard Shots
|
Union Pacific
|
This scene can only be duplicated for another two years or so from the time of this picture. UP power is working on assembling the "Public Service" coal train. One remaining generator at Xcel Energy's Cherokee Power Station in Denver is powered by coal. Two others have already been shut down and replaced by natural gas. The final generator powered by coal will make the switch to natural gas by 2017, according to Xcel. Once that happens, the Cherokee Plant will no longer be a customer of UP, eliminating (roughly) 6-8 coal trains (that counts loads and empties) from the Moffat per week.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|