|
|
|
|
Friday, January 4, 2019
|
Kevin Morgan
|
|
|
CP DS004 (Pecos X-Over)
Denver, CO
|
1130 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Amtrak
|
On a beautiful January morning, the California Zephyr approaches Pecos Crossover on Main 3. In mid-2018, Amtrak executives had said that no long distance Amtrak trains would run over any stretch of track that did not have Positive Train Control (PTC) implemented. Fortunately, they backed down on that as several train, including the Zephyr, would have been impacted. The former Grande between Grand Junction and Helper does not have PTC (and UP currently has no plans to add it).
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
Friday, January 4, 2019
|
Kevin Morgan
|
|
|
CP DS012 (East Leyden)
Arvada, CO
|
1249 (Add a Comment)
|
|
|
Moffat Tunnel (UP)
|
Union Pacific
|
UP 1989 led this coal empty in to Denver from the Greeley Sub. However, because the train entered North Yard for an air test, it departed with UP 1989 trailing. Unfortunately, because the (new) leader on the opposite end stopped loading. While three units was enough for the train to make it up to the Moffat Tunnel (it was configured 2x2), the train could not run 1x2, which is what it would effectively be if the crew isolated the lead unit that was not loading. The crew believed they could reset the fault causing the train to not load, so it would depart Leyden shortly after this shot was taken.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|