ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 112676
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Tolland (9,356 ft)
Gilpin County, CO
300
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
The deciduous trees here at Tolland are some late-bloomers. I was up here about a month earlier in May, and all these trees were still devoid of leaves. However, thanks to a relatively wet spring, they are now as green as you can get, filled with leaves as this westbound coal empty passes by at the west end of Tolland. Note the classic yellow and green Tolland school house on the left side of the frame.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112675
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Rollins to Tolland (MP 41.2 to MP 45.8)
Gilpin County, CO
325
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
I was hoping for some direct sunlight here, east of Tolland, as this coal empty crosses over South Boulder Creek. However, in retrospect, the overcast skies to the west probably helped the shot as the sun might have created some odd shadows from this perspective. The train crosses South Boulder Creek to run parallel to East Portal Road for a few thousand feet on the approach to Tolland.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112674
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Rollins to Tolland (MP 41.2 to MP 45.8)
Gilpin County, CO
315
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
At roughly 8,700 feet (2650 meters) above sea level, four units lead this westbound coal empty along South Boulder Creek between Rollins and Tolland. East Portal Road (also referred to as Tolland Road on some maps and in some places) is a well-maintained dirt road that carries a lot of vehicular traffic. Fishers, campers, hikers, and off-roaders all come up here to the high country, in addition to the handful of railfans.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112673
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Boulder County, CO
298
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
With partly cloudy skies, the scene here at Cliff had been fluctuating between brilliant light and muted shade while waiting for this westbound coal empty to arrive. Alas, muted shade ended up being the conditions when it actually arrived. UP 6397 is facing a green signal as the train has picked up some speed, the max authorized speed increasing a bit here at Cliff. UP 6397 started life in scarlet and gray as SP 351 in August of 1995, so it certainly no stranger to the Moffat.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112672
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Cliff (6,900 ft)
Boulder County, CO
266
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
Roughly halfway through the block at Cliff, the main and the siding both cross over South Boulder Creek. Here, the four units on this westbound coal empty are crossing over that exact bridge as they continue west on the main track.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112671
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Cliff (6,900 ft)
Boulder County, CO
265
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
A somewhat rare UP coal empty crosses CO-72 as it heads west on a green signal on the main at Cliff. At this spot, the tracks run between South Boulder Creek and the highway.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112668
Date Shot
Photo By
Friday, June 27, 2025 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
256
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
The crew for this westbound coal empty was called about five hours earlier at 8am, before the train had actually arrived on Bypass 1 in Denver. Once arriving, the crew had to shuffle some power around. Alas, the SD70ACe in the fourth position is not loading, and the train is limping into Leyden to check the problem. It would turn out to be a faulty MU cable, and not a problem with the unit itself. After replacing the MU cable, the unit started loading and the train continued west after a 15 minute delay.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112660
Date Shot
Photo By
Tuesday, June 24, 2025 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
282
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
It appears that Union Pacific is planning to replace some ties on the Moffat in the not-too-distant future. The West Local ran out of North Yard two days early and spotted these three gondolas in the house track here at Rocky.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112644
Date Shot
Photo By
Monday, June 23, 2025 Kevin Morgan
Location
Times Viewed
Crescent (5,550 ft)
Jefferson County, CO
277
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
UP is hauling their EC-5 track geometry car through the siding at Crescent. The geometry car assesses the rail geometry as it moves, ensuring compliance with FRA standards. It is also a preventative maintenance tool to look for damage. The car uses laser systems and vehicle/track interaction (V/TI) systems to perform its work.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112643
Date Shot
Photo By
Monday, June 23, 2025 Kevin Morgan
Location
Times Viewed
Crescent (5,550 ft)
Jefferson County, CO
247
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
UP 7232 is heading west through the siding at Crescent, hauling UP's EC-5 track geometry car. The train is slowly heading west and will stop at the west end of Crescent and wait for the Zephyr to overtake the work train.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112642
Date Shot
Photo By
Monday, June 23, 2025 Kevin Morgan
Location
Times Viewed
CP DS030 (East Crescent)
Jefferson County, CO
244
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
An C44ACM, rebuilt from an AC4400CW, is the sole unit on a short work train that includes UP's EC-5 track geometry car. The car used to be self-propelled, but now requires it be pulled by a locomotive.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112641
Date Shot
Photo By
Monday, June 23, 2025 Kevin Morgan
Location
Times Viewed
Plain (6,530 ft)
Jefferson County, CO
271
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
Five UP maintenance workers are walking the rails between Tunnel 2 and Tunnel 3, checking for defects. They found several tie plates that needed to be replaced, and marked them accordingly for a maintenance crew that will come out of Plain and replace them.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112630
Date Shot
Photo By
Friday, June 20, 2025 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
249
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
I am not a maintenance of way expert, but I believe that the maintenance vehicle on the left is a spike driver and the vehicle on the right is a spike puller. they are currently tied down in the house track at Rocky.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112629
Date Shot
Photo By
Friday, June 20, 2025 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
213
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
UP has a track tamper and a ballast regulator tied down in the house track at Rocky. MOW crews have arrived and will be taking the equipment out for some work after the Zephyr passes by.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 112622
Date Shot
Photo By
Thursday, June 19, 2025 Kevin Morgan
Location
Times Viewed
CP DS019 (West Rocky)
Arvada, CO
250
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Union Pacific
At the west switch of Rocky, two conductors (one of which might be a trainee) watch as a UP track worker helps to align the switch from the siding to the main. DS-380 has been unable to throw the switch under power this morning.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.