ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 104172
Date Shot
Photo By
Monday, March 19, 2012 Kevin Morgan
Location
Times Viewed
CP DS016 (East Rocky)
Arvada, CO
1761
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Now running only 20 minutes late (the train picked up 15 minutes since departing Granby), the Zephyr passes the east switch at Rocky. If you noticed the signal at Rocky is dark, it is because the approach lit circuit has quite kicked in yet to activate the signal!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104171
Date Shot
Photo By
Monday, March 19, 2012 Kevin Morgan
Location
Times Viewed

Granby, CO
1869
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Amtrak approaches the (extremely nice) depot in Granby and prepares for a brief station stop. How brief? Long enough to get the two passengers on that are waiting to board the train. The entire stop lasted less than 90 seconds.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104170
Date Shot
Photo By
Monday, March 19, 2012 Kevin Morgan
Location
Times Viewed

Granby, CO
1955
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A 35-minute-late Zephyr slows on the main at Granby in preparation for it scheduled station stop at the depot. An eastbound BNSF manifest cleared up in the siding to allow the Zephyr to pass it without being further delayed.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104157
Date Shot
Photo By
Monday, March 19, 2012 Kevin Morgan
Location
Times Viewed
West Flat
Parshall, CO
1606
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
This is a fairly typical consist for the Zephyr these days. Two P42DCs, a baggage car and eight Superliners. Depending on the numbers of bookings, the only real variance is that the Zephyr may have only seven Superliners or may in fact have nine.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104156
Date Shot
Photo By
Monday, March 19, 2012 Kevin Morgan
Location
Times Viewed
Flat
Parshall, CO
1855
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
After meeting the eastbound MRONY at Flat, the westbound Zephyr has a clear signal out the west end. The DPU on the end of the MRONY can be seen here as the manifest starts to pull east.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104121
Date Shot
Photo By
Sunday, March 4, 2012 Kevin Morgan
Location
Times Viewed
Rollins (8,320 ft)
Rollinsville, CO
2002
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak, Union Pacific
The westbound Zephyr has two bonus cars on the tail end today. UP's Sunset and Stanford were added to the train in Omaha and are getting a ride to the west coast. The Zephyr is running about 90 minutes late this morning as it makes its way through the siding at Rollins.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104120
Date Shot
Photo By
Sunday, March 4, 2012 Kevin Morgan
Location
Times Viewed
Rollins (8,320 ft)
Rollinsville, CO
2289
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
When the loaded coal train in this shot arrived at Rollins, maintenance on the siding meant the coal train had to hold the main line. With the maintenance now in the clear, the westbound Zephyr is coming through on the siding.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104119
Date Shot
Photo By
Sunday, March 4, 2012 Kevin Morgan
Location
Times Viewed
Arvada Siding (MP 7 to MP 8)
Arvada, CO
1700
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak, Union Pacific
Despite a bit of dust, these heavy weight Union Pacific passenger cars (the Sunset and the Stanford) look pretty good. These were once Espee cars so they probably don't look as good as they once did, but yellow is better than the torch!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104118
Date Shot
Photo By
Sunday, March 4, 2012 Kevin Morgan
Location
Times Viewed
Arvada Siding (MP 6 to MP 7)
Arvada, CO
1837
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
It's not uncommon in winter for trains to kick up some snow...but dust? This is due to all the work being done by UP in the effort to construct the new main track (Main 2) between Tennyson Street and Pierce Street. The old Arvada Siding has been completely taken out and grading is now being done in preparation for the welded rail that will become Main 2. The new Arvada Siding is visible...buried in ballast, toward the bottom and right of the picture.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104108
Date Shot
Photo By
Friday, March 2, 2012 Kevin Morgan
Location
Times Viewed
CP DS013 (West Leyden)
Arvada, CO
2392
(1 Comment Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
A few minutes after the previous photo was taken, the westbound Zephyr crosses over Indiana Street. The Zephyr was holding in the siding at Leyden awaiting the arrival of the coal load. With trains at Plain and Rocky, the dispatcher had little choice but to run the coal train all the way to Leyden and briefly (less than five minutes) hold up the Zephyr.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104101
Date Shot
Photo By
Wednesday, February 29, 2012 Kevin Morgan
Location
Times Viewed
CP DS012 (East Leyden)
Arvada, CO
1660
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
After arriving in Denver an hour late, the Amtrak crews worked fast and got the Zephyr out of town only 15 minutes late. Here, the train is knocking down a clear signal at the east end of Leyden on its journey west. The signal here at east Leyden is one of only three sets of signals between Utah Junction and East Portal that have not been replaced by UP yet. The other two being Utah Junction itself (on the signal bridge) and the intermediates at Kipling. The intermediate's days are numbered too as a new signal is already in place once the new two main track project is completed.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104094
Date Shot
Photo By
Sunday, February 26, 2012 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
1727
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Several minutes after passing the MNYGJ at Rocky, the Zephyr has now made a 180° turn and is headed north through Clay. This is the final picture in a series of four.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104093
Date Shot
Photo By
Sunday, February 26, 2012 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
2034
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The westbound California Zephyr passes the power of the MNYGJ at the west end of Rocky as the Zephyr continues west. This is the third picture in a series of four. Here is the fourth picture in the series.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104092
Date Shot
Photo By
Sunday, February 26, 2012 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
1972
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The westbound California Zephyr proceeds west on the mainline at Rocky, running around the MNYGJ which is stopped on the siding. This is the second picture in a series of four. Here is the third picture in the series.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 104091
Date Shot
Photo By
Sunday, February 26, 2012 Kevin Morgan
Location
Times Viewed
Rocky (7,330ft)
Arvada, CO
1812
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
DS-82 has put the MNYGJ in the siding at Rocky to allow a late (by 2 1/2 hours) California Zephyr to run around on the mainline. Here, the manifest is stopped on the siding and Amtrak is proceeding west on clear signals. This is the first picture in a series of four. Here is the second picture in the series.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.