ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 103741
Date Shot
Photo By
Friday, May 20, 2011 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
2176
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Happy Birthday Amtrak! Phase I and Phase II Heritage P42DC's lead the Zephyr at Leyden. The Zephyr is running about 3 1/2 hours late this morning, about 90 minutes of that due to a Vice Presidential Motorcade. VP Biden was in town and his motorcade route traversed I-25 over the tracks. Consequently, the Secret Service wasn't allowing any trains under the bridge.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103740
Date Shot
Photo By
Friday, May 20, 2011 Kevin Morgan
Location
Times Viewed
Leyden (7,020ft)
Arvada, CO
2705
(2 Comments Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The westbound California Zephyr has a special treat on this Friday as two of the four Heritage Units are on the point. AMTK 156 (Phase I) and AMTK 66 (Phase II) lead nine Superliners under partly cloudy skies.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103739
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
Chemical (MP 14.5)
Arvada, CO
2514
(2 Comments Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
One last look at the Pointless Arrow on the Zephyr's eastward trip toward Denver. Personally, I would prefer any of the Heritage schemes to the current Phase V scheme...What do you think?
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103738
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
Big Ten Curve (MP 19.5 to MP 20.2)
Arvada, CO
3074
(3 Comments Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The eastbound Zephyr comes through Big Ten Curve and starts to descend toward Rocky where it will pass a manifest that it has been following since Cliff. Amtrak's Phase I Heritage Unit leads the Zephyr east.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103737
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
Blue Mountain Drive (MP 22.43)
Arvada, CO
3072
(1 Comment Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
After taking this picture, I started thinking about something. This might be the first time an Amtrak engine in the Phase I scheme (with the Bloody nose) has ever run over the Moffat. Amtrak ran through Wyoming until the Rio Grande Zephyr ended in 1983, which was long after the Phase I scheme had been discontinued. Here, the Pointless Arrow crossed the road at Blue Mountain.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103736
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
Plain (6,530 ft)
Arvada, CO
2551
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
The "Bloody Nose" Phase I Amtrak Heritage Unit leads the eastbound Zephyr down a snowy main track at Plain. Don't think that simply because it is May that the snow is over in Colorado!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103735
Date Shot
Photo By
Thursday, May 12, 2011 Kevin Morgan
Location
Times Viewed
CP DS038 (West Cliff)
Pinecliff, CO
3074
(1 Comment Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
To celebrate the 40th Anniversary of Amtrak, four P42DC's were painted in heritage schemes. Each scheme was inspired by a scheme previously used by Amtrak. The first of the four units to visit Colorado on the Zephyr was AMTK 156, wearing a Phase I inspired scheme with a Bloody Nose at a Pointless Arrow. I missed its trip west, but caught it coming back east. Here it is at the west switch of Cliff, looking dang good in my opinion.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103729
Date Shot
Photo By
Saturday, May 7, 2011 Kevin Morgan
Location
Times Viewed
CP DS012 (East Leyden)
Arvada, CO
1769
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Thanks to some track improvements in the last few years, the Zephyr can go 60 MPH starting just east of Rocky all the way into town. If you are at west Leyden when the Zephyr is passing Chemical, you'll be hard-pressed making it to east Leyden ahead of him!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103728
Date Shot
Photo By
Saturday, May 7, 2011 Kevin Morgan
Location
Times Viewed
Crescent (5,550 ft)
Crescent, CO
1717
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
An extra P42DC has been added to the eastbound Zephyr as it comes around the corner and over the grade crossing at Crescent. The train had a standard Zephyr consist, so I'm not sure why the extra unit was there. My guess would be either that one of the two training units had a problem, or one of the three units is being transported to Chicago, perhaps for some maintenance.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103726
Date Shot
Photo By
Saturday, May 7, 2011 Kevin Morgan
Location
Times Viewed
Kipling (MP 9.8)
Arvada, CO
2468
(2 Comments Posted)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
These signals are two of the last holdouts of classic Rio Grande signals on the Moffat. The only other location between Denver and the Moffat where you can find these target signals is at Utah Junction and east Leyden. Unfortunately, these are going to be coming down very soon. A few dozen feet west of this shot (behind me), a new signal mast has been erected.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103723
Date Shot
Photo By
Saturday, April 23, 2011 Kevin Morgan
Location
Times Viewed
Denver Amshack
Denver, CO
1791
(Add a Comment)
Subdivision
Railroad
Denver Union Terminal (RTD) Amtrak
After a fantastic trip east, the Zephyr arrived at the temporary "Amshack" in Denver 25 minutes early! And while "Amshack" tends to be a pejorative term used for crummy, tiny depots, that is not the case in Denver. The temporary depot is, in my opinion, nicer than a lot of permanent depots!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103722
Date Shot
Photo By
Saturday, April 23, 2011 Kevin Morgan
Location
Times Viewed
CP DS057 (East Winter Park)
Winter Park, CO
2086
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Since I got a shot of the Zephyr plunging into the Moffat Tunnel on the trip west, I was happy that I had the chance to also grab a shot as we were about to enter the west portal of the Moffat Tunnel on the journey back home.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103721
Date Shot
Photo By
Saturday, April 23, 2011 Kevin Morgan
Location
Times Viewed
MP 62 (Fraser)
Fraser, CO
2328
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
During at station stop at Fraser, the Conductor pauses briefly to speak with a passenger who is gathering their luggage in preparation for boarding. Note the clear signal in the distance, indicating DS-82 is ready for us once the stop is complete.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103720
Date Shot
Photo By
Saturday, April 23, 2011 Kevin Morgan
Location
Times Viewed
MP 90
Sulphur Springs, CO
2203
(Add a Comment)
Subdivision
Railroad
Moffat Tunnel (UP) Amtrak
Passengers look out the window of the Lounge car in the middle of Byers Canyon. Note the power for the train on one side of the frame and US-40 across the Colorado River on the other side of the frame!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 103719
Date Shot
Photo By
Saturday, April 23, 2011 Kevin Morgan
Location
Times Viewed
MP 360 (Glenwood)
Glenwood Springs, CO
1977
(Add a Comment)
Subdivision
Railroad
Glenwood Springs (UP) Amtrak
Gone are the days when this view of the arriving Zephyr was dominated by F40PH's in Phase III paint! Now, it is Phase V P42DC's...but at least Amtrak is still around after 40 years.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.